Navigation menu

新闻中心

长江地区新泵站迎“年度体检”,新泵站明年起

湖北日报讯(培训记者彭多轩)近日,武汉长江新区开始对主排水泵站进行大规模年度维护工作。新区综治中心在环境和水务局的领导下,组织对芜湖泵站、长河第一泵站、长河第二泵站等主要排水设施进行深度检修,对今年洪灾后设备安全检修工作作出了阶段性总结。 At the Wuhu Pumping Station maintenance site, reporters saw engineers calibrating the shaft of Unit 2 and replacing worn parts. "After calibration, the equipment runs more stably, with less vibration, increases efficiency and can extend the life of components."有人说这些检查持续大约一个月,每年至少在一台设备上完成,而其余的则进行定期维护。 Wuhu Pumping Station was built in 1970 and put1973年投入运行,设计排量64立方米/秒。 We have been providing continuous service for more than 50 years. The main pumping station building is structurally collapsing due to vibrations from long-term operation and plans include its reconstruction. “新站建设前,必须进行详细维护,确保各单元都能可靠运行。”新区综合管理中心张建华说。 In particular, all the station's main equipment is manufactured in Wuhan.最初依靠外部供应,现在电机、水泵、控制系统等主要由公司场地供应,大大提高了运维效率。 "If there is an equipment failure, our on-site engineer will be there and respond within 30 minutes," said the on-site technician. With the rapid development of urban construction, residents are putting higher demands on drainage and flooding. As a key part富川河口河口段综合整治工程中,新建斗马河排水泵站已进入主体安装阶段。泵站共配备4台机组,设计流量80立方米/秒。它按照50年防洪排涝标准建设。预计明年4月开始试运营。在十多米深的泵井底部,有一个起重装置将发动机部件固定到位。 “每个螺栓的扭矩、每个轴的对中度,未来可能只需要一两个人就可以工作,自动化程度将大大提高。”某建筑公司总监李爱武说。“我们的目标是从24小时抑制暴雨变成24小时防暴雨。”新区水环境局局长郝一吉表示,泵站的维护建设不仅提高了能力,也积极满足了用户的需求。rban 的发展和居民的期望。